Ok, yesterday we were able to get ten (10) wires dropped into the shared wall between the living room and the new den/bedroom. We used an electrical box that was existing in the wall on both sides. Below you can see the wires on the attic side and on the bedroom side. The other end of the wire is fed through a hole in the office... we'll get to the office end of the wires later -- I haven't touched them yet.
In the next pictures you can see the wires are punched into the RJ-45 jacks and snapped into face plate and secured to the wall.
The one with four (4) is on the bedroom side and the one with six (6) is on the living room side. I also had to move the place where the cable entered the house. It used to be in the farthest guest bedroom near where the red dot is on the floor plan that I posted yesterday. Now it enters the house in the office, high up on the wall so I can run the cable along the top of the wall into the closet. Here are a couple of pictures of that:
So that's all I was able to accomplish yesterday. We'll see how it goes today!

No comments:

Post a Comment